joão gilberto vaz joao gilberto vaz

Arena do Grêmio votado como melhor estádio do mundo

Summary

Third edition of Stadium of the Year plebiscite took place between Jan 23 and Feb 24, 2013. A record number of 14,439 people took part in the vote, giving 216,585 points in total (each person had 15 points to share between 5 stadiums by giving notes: 5, 4, 3, 2 and 1 point). Most voters were located in Brazil, Poland, Indonesia, Israel and France.

Below you can see the complete list of all stadia with the number of points scored.

Results

Position Photo Description
129,627pts Arena do Gremio

Arena do GrêmioPorto Alegre Brazil Brazil

  • club: Grêmio FBPA
  • capacity: 60,540
  • construction: 09.2010 – 12.2012
  • cost: R$ 540 million ($260m / €197m)
  • design: Plarq Arquitetura
221,148pts Stadion Narodowy

Stadion NarodowyWarsaw Polska Poland

  • club: national team
  • capacity: 58,145
  • construction: 05.2009 – 04.2012
  • cost: 1.9 billion PLN ($622m / €470m)
  • design: JSK Architekci
319,187pts Grand Stade Lille-Métropole

Grand Stade Lille-MétropoleLille France France

  • club: OSC Lille
  • capacity: 50,157
  • construction: 2009 – 06.2012
  • cost: € 282 million ($373m)
  • design: Pierre Ferret, Denis Valode & Jean Pistre
417,042pts Friends Arena

Friends ArenaSolna Sweden Sweden

  • club: AIK Fotboll
  • capacity: 54,329
  • construction: 07.12.2009 – 10.2012
  • cost: 1.9 billion SEK ($290m / €220m)
  • design: Berg | C. F. Møller Architects, Arkitekterna Krook&Tjäder, Populous (współpraca)
516,512pts Stadion Utama Riau

Stadion Utama RiauPekanbaru Indonesia Indonesia

  • club: PSPS Pekanbaru
  • capacity: 40,700
  • construction: 2010 – 2012
  • cost: 800 billion IDR ($83m / €62m)
  • design: ?
616,295pts Stade Océane

Stade OcéaneLe Havre France France

  • club: Le Havre AC
  • capacity: 25,178
  • construction: 12.07.2010 – 31.05.2012
  • cost: € 101 million ($133m)
  • design: KSS Group, SCAU
714,023pts Incheon Football Stadium

London Olympic StadiumLondon England England

  • club: –
  • capacity: 80,000
  • construction: 2007 – 2012
  • cost: £ 486 million ($787m / €595m)
  • design: Populous
813,978pts Bunyodkor Stadioni

Bunyodkor StadioniTashkent Uzbekistan Uzbekistan

  • club: Bunyodkor PFK
  • capacity: 34,000
  • construction: 13.11.2008 – 2012
  • cost: ?
  • design: GMP Architekten / Oberhofer Stahlbau
913,943pts Netanya Stadium

Netanya StadiumNetanya Israel Israel

  • club: Maccabi Netanya FC
  • capacity: 13,800
  • construction: 2005 – 2012
  • cost: $60 million (€45m)
  • design: GAB Architects
1011,024pts BBVA Compass Stadium

BBVA Compass StadiumHouston USA USA

  • club: Houston Dynamo
  • capacity: 22,000
  • construction: 05.02.2011 – 04.2012
  • cost: $ 95.5 million (€72m)
  • design: Populous
118,956pts New York Stadium

New York StadiumRotherham England England

  • club: Rotherham United FC
  • capacity: 12,021
  • construction: 16.06.2011 – 19.07.2012
  • cost: £ 25 million ($40m / €31m)
  • design: S+P Architects
128,738pts 8km Stadionu

8km StadionuBaku Azerbaijan Azerbaijan

  • club: –
  • capacity: 11,000
  • construction: 30.04.2010 – 08.2012
  • cost: ?
  • design: ?
138,703pts Estádio Raimundo Sampaio (Independência)

Estádio Raimundo SampaioBelo Horizonte Brazil Brazil

  • club: América FC, Clube Atlético Mineiro
  • capacity: 23,950
  • construction: 22.01.2010 – 04.2012
  • cost: R$ 125 million ($60m / €46m)
  • design: Missyor Arquitetos
146,205pts Myresjöhus Arena

Myresjöhus ArenaVaxjo Sweden Sweden

  • club: Östers IF
  • capacity: 12,200
  • construction: 03.2011 – 08.2012
  • cost: 204 million SEK ($31m / €24m)
  • design: Iwdal Akerblad Arkitektbyran AB
155,816pts Sparda-Bank-Hessen-Stadion

Sparda-Bank-Hessen-StadionOffenbach Germany Germany

  • club: Offenbacher Fußball-Club Kickers 1901 e. V.
  • capacity: 20,600
  • construction: 02.2011 – 08.2012
  • cost: € 27 million ($36m)
  • design: Bremer AG
165,388pts Incheon Football Stadium

Incheon Football StadiumIncheon South Korea South Korea

  • club: Incheon United
  • capacity: 20,891
  • construction: 05.2008 – 03.2012
  • cost: $ 110 million (€83m)
  • design: ?

Stadium of the Year 2012 Regulations

  1. Submitting nominations: Every reader/user of StadiumDB.com may submit a nomination. Unlike many competitions, ours is user-oriented, so we don’t require any fees, text messages, e-mail submissions or liking us on facebook (we do appreciate it, though). To make it as easy as possible, we give you our online survey where you can see stadiums already listed and may suggest further nominations.
  2. Nomination requirements: To become a nominee, a stadium has to meet several criteria. It has to hold at least 10,000 people and be opened in 2012. The latter means hosting at least one event with all stands available to the public. Stadiums built from scratch are taken into consideration as well as those having a thorough redevelopment. In general, we accept stadia that have had 75% of their structure altered. If any particular case raises doubts over the extent of changes, it would be dealt with individually. The competition is about football stadiums, which means we select between venues that are capable of hosting a football (or soccer, if you prefer) game. They may still have running, cycling or speedway tracks around their pitch, or have pitches larger than football-specific ones.
  3. Nomination process schedule: Jan 15 – Jan 22, 2013.
  4. Voting process schedule: Your votes will be accepted between Jan 23 and Feb 23, 2013. There’s no need to send e-mails or comment on facebook, the above form is the only means of voting. Each person is entitled to cast one vote, selecting his top 5 venues (giving them, respectively, 5, 4, 3, 2 and 1 point).

 

Fonte: http://stadiumdb.com/competitions/stadium_of_the_year_2012

Publicar Comentário

*